Case Studies

Clean Rooms

Energizer Batteries

Energizer Batteries

24 June 2009

Firemaster Wall & Ceiling

Eurobond internal Firemaster panels and Eurobond Doors have been employed to help create a controlled environment for the production of lithium batteries.

View All

Commercial Offices

Alba Pavilions

Alba Pavilions

03 July 2008

Europanel Extra

Europanel Extra steel faced composite panels from Eurobond are being used on a multi-million pound development at the Alba Business Park in Livingston. Offering consistent, high quality architectural flatness, Europanel Extra was ideal for the project, with the developers looking to attract high profile occupants looking for prestigious office space.

Chelsea Building Society

Chelsea Building Society

11 July 2006

Europanel

Located in a previously derelict 5 acre brownfield site, the new campus was required to boast a sustainable design that would deliver environmental improvements to the area and gain a BREEAM rating of ‘excellent’.

View All

Education

Orpington College

Orpington College

01 February 2010

Europanel

Orpington College

Burnley College

Burnley College

18 January 2010

Europanel

Education in Lancashire has benefited from a significant makeover following major investment led by Burnley College and the University of Central Lancashire. Some £81 million has been injected into the development of a new iconic campus for Burnley’s growing student population.

View All

Energy

Grundon Waste Management

Grundon Waste Management

14 September 2009

Europanel Extra

Our Europanel Extra composite panels were specified for the Grundon Waste Management Plant in Lakeside, Colnbrook, the new state-of-the-art plant is a major part of the £160 million redevelopment of an existing waste processing facility.

 

View All

Exhibition and Conference Centres

Royal Highland Hall

Royal Highland Hall

23 November 2005

Europanel

The Royal Highland Hall receives 1.2 million visitors each year, contributing £200m to local economy.  Eurobond’s Europanel 135mm with HPS200 Albatross (white) panels, combined with Solent Blue on the wall and corner cladding panels of the entrance were used for this build.

View All

Food Processing

Kerrygold

Kerrygold

08 September 2009

Europanel

A new Kerrygold cheese packing facility in Leek, Staffordshire is benefiting from the industry-leading quality of Eurobond’s non combustible, stone wool cored composite panel system.

 

Greggs Bakery

Greggs Bakery

06 April 2009

Firemaster Extra & Rockspan Extra

We have risen to the challenge and supplied both internal and external panel systems for Greggs Bakeries new production unit in Manchester.  Our Firemaster Wall Extra™ and Rockspan Extra™ were specified for the development thanks to their excellent fire safety credentials.

 

View All

Health

Royal Bolton Hospital

Royal Bolton Hospital

10 August 2009

Europanel

Our Europanel system has been used throughout the external envelope of the new extension at Royal Bolton Hospital. Completed in May 2009 following a year of planning the £2 million storage facility will house the files of patients treated at the hospital.

Ipswich Hospital

Ipswich Hospital

21 August 2008

Europanel Extra

Eurobonds Europanel Extra composite cladding panels have been used in the construction of a new £26 million treatment centre at Ipswich Hospital, one of the largest hospital facilities in East Anglia. Europanel Extra was chosen as it met the aesthetic requirements of the building.

View All

MoD

RAF Northolt

RAF Northolt

08 May 2009

Europanel Extra

RAF Northolt has enlisted the help of Eurobond to overhaul its facilities near Heathrow airport. RAF Northolt utilised Europanel ExtraTM, with its fire safety credentials and excellent spanning capabilities, for the development of maintenance units, offices and storage houses.

 

View All

Public Buildings

Snowdonia Visitor Centre

Snowdonia Visitor Centre

11 August 2008

Firemaster

When your visitor centre is perched 1,060 metres above sea level fire performance becomes key, meaning the total fire resistance offered by the Eurobond Firemaster internal wall panel system was of paramount importance for Hafod Eryri, the new Snowdon Summit Visitor Centre.

View All

Residential

Glasgow Gorbals

Glasgow Gorbals

14 September 2009

Europanel

Eurobond’s flagship product, Europanel, is used extensively in the large-scale development and regeneration of the Gorbals neighbourhood in Glasgow

Velocity

Velocity

28 October 2008

Rainspan

The team behind Sheffield's landmark development, Velocity, employed a very inventive installation method for this unique build by utilising our recently launched Rainspan panel. 

View All

Retail

Boundary Mills

Boundary Mills

11 September 2009

Rockspan Extra

Rockspan Extra panels from Eurobond have been used for the new Boundary Mill superstore in Vivary Way, Colne.

Ikea

Ikea

10 September 2009

Firemaster

Aston-under-Lyne’s new Ikea store has been partitioned using the Eurobond Firemaster System. The stone wool cored composite panels provide the highest level of fire resistance, reducing the risk of flame spread in the event of a fire. 

View All

Sport and Leisure

Cardiff City Stadium

Cardiff City Stadium

01 September 2009

Europanel

The brand new Cardiff City Stadium has scored first class fire resistance and aesthetics thanks to Eurobond. The Cardiff-based company manufactured bespoke 150mm thick stone wool panels for the stadium which were finished with Corus Colorcoat® to compliment the club colours.

Epsom Racecourse

Epsom Racecourse

19 November 2007

Europanel Extra

Eurobond Europanel Extra has been specified for the construction of the impressive new entrance pavilion at Epsom Downs Racecourse. The enhanced spanning capability of Europanel Extra reduces the need for secondary steelwork, which was crucial to meet an exceptionally tight timescale.

View All

Transport

Channel Tunnel Rail Link

Channel Tunnel Rail Link

02 September 2009

Rockspan Extra

Eurobond has supplied over 12,000 sqm of its Rockspan Extra composite panels for the construction of the Temple Mills train depot, a key part of the Channel Tunnel Rail Link (CTRL) at Stratford. The panels not only satisfied stringent fire performance requirements, but also provided the facades with an impressively flat and lightweight appearance.

BAE

BAE

31 July 2003

Europanel

On the front and rear elevations the composite panels were installed onto a series of buttress-like protrusions, or ‘plant-ons’, each measuring over 40m from the ground to eaves level.  These were supplied in Metallic silver to contrast with the rest of the cladding.

View All

Warehouse, Storage and Distribution

Tesco Distribution Centre

Tesco Distribution Centre

01 September 2009

Rockspan Extra

A prerequisite from Tesco that the company’s buildings must be constructed from non-combustible composite panels has led to contractor ISD Coldstores installing Eurobond Rockspan Extra for Tesco’s distribution centre in Magor, Wales. 

Glamorgan Record Office

Glamorgan Record Office

06 April 2009

Europanel Extra

As the leading manufacturers of composite panels, we have gone to great lengths to develop a 15 metre long non-combustible Europanel Extra Rockwool core composite panel for the new Glamorgan Records Office in Cardiff. Leased from Cardiff University, the Records Office has been using various temporary storage measures, with differing degrees of risk to the records, since outgrowing its original accommodation 40 years ago.

 

View All