National Graphene Institute - Rainspan Case Study

14th March, 2017

One of the most challenging aspects of the project was the meticulously planned installation of the stainless steel rainscreen, using the Rainspan composite panel as the supporting structure removed this detailed installation from the critical path and simplified the construction process to help reduce the costs and complexity of the structure.

Learn how composite panels help reduce the complexity of the structure.

Full case study available here